We rode the Riverside to Anaheim Canyon “Turkey Burner” today, November 26th, and found some interesting stuff on Green River at the upper end of OC’s section of the Santa Ana River Trail bikeway.
They are widening the WB 91 freeway (AGAIN). The trailhead parking area is closed; teh gate where teh SART drops onto the cul de sac of Green River is closed, but bikeway access is open from the sidewalk corner curb cut along the parking stalls.
Up the road, Green River Road along the 91 freeway is reduced to a stretch of one lane road, with red lights controlling when traffic flows up or down, and there is a 2 way un separated bikeway painted on the south east side of green river adjacent to the freeway construction work to give us an option of staying of the one travel lane…