A different option for a Sunday Ride?
Lets have a ride that STARTS and ENDS at a brewery for lunch!
Park at Main Street Brewery in Corona, at 8:50 & be ready to ride at 9am to the Corona Main Station to board the MetroLink train to Fullerton at 9:11, then ride back up the El Conejo Trail and SART to Corona !
No Drop route with several regroups.
ROUTE: FundaySunday Fullerton to Corona (1/9/25)
Main Street Brewery to Train: 9 - 9:08 am
0.8 Miles +19 ft (23.8'/m) CF2
https://ridewithgps.com/routes/49432753
Train Schedule:
91/Perris Valley 1763 LEAVES Corona at 9:11 - dets to Fullerton at 9:40.
Fullerton to Corona: 9:40 ~ 11:40 (@15 mph pace) 12:10 (@12 mph pace)
29.4 Miles +1,193 ft (40.6'/m) CF
https://ridewithgps.com/routes/49432741