Back to All Events

Tuesday Rides (#T04)

Ride Start: University Park
Please park on streets & gather at building

Tuesday route slips: most have 30 mile & 25 mile side-by-side, so if you want 2 copies - print double sided and cut in half to have 2 sets on one sheet of paper

ROUTE SLIPS: Tu04 Newport Coast via Laguna Beach (2/13/24)
Blk Dot (fka Starbucks) @ Crystal Cove Center on Coast Highway

Blk Dot may not yet be open by Feb 20th - Plan B is the Date Shack:
On the 25,
stop at the Date Shack at mile 10.3
On the 30 - skip the shopping center at mile 15.8 and make a box turn at the signal at CRYSTAL HEIGHTS at mile 16 to cross PCH; take the Crystal Cove Trail bike path to the Shake Shack.
After - take the path north along PCH and turn Left (north) on PCH from CRYSTAL COVE/ LOS TRANCOS at the signal: DETAIL OF PLAN B


30.4 miles (15.8) +/-1,173 ft {CF 3 38.6’/m}
http://ridewithgps.com/routes/11728527
> Detail of Mile 12.0 - 12.3 (only on full 30) 

25.2* miles (10.6) +/-966 ft {CF 3 38.2’/m}
https://ridewithgps.com/routes/18677499
(Skips Laguna Canyon & Laguna Beach) 

DETOUR ON 30 MILE ROUTE TODAY
There is 1/2 mile of construction zone on Lagna Canyon.
“TAKE THE LANE” after a platoon of traffic goes by and control YOUR LANE 1/2 mile until the shoulder resumes -
OR To avoid it, take the 25 mile SHORT ROUTE,
OR take the +2.5 mile detour: Pavona Sidewalk & Romano sidewalk to Lake Forest Road to Moulton to El Toro Road. The construction is at mile 8.4 but to detour, you must cross the 133 @ mile 4.5.
The DETOUR WILL ADD 2.5 MILES to today’s ride.
Map/Profile/.tcx
This DETOUR will be offered until the construction work is completed by Caltrans some day…

Please share feedback suggestions & comments on this, or any BCI Ride with our Ride Coordinator

Many gather for lunch after the ride at the local shopping center.

Earlier Event: February 18
Sunday Rides (#13)